Case Study

Steam and Valve Retrofit Project Provides Long Beach Public Schools with Energy Savings and Reduced Emissions

SMI Impact

Savings in excess of 4,270 Mlb of fuel per year

CO2 emission reduction of 347,345 lbs of coal burned

Installation of 562 new steam traps and 300 steam and hot water control valves

Customer

A national ESCO contracted Steam Management, Inc. to design and complete installation of multiple ECMs at Long Beach Public Schools in Long Beach, New York.

Conditions

  • Legacy pneumatic control systems in all schools

  • Original equipment steam systems throughout all schools

  • Hurricane damaged basements and crawlspaces in multiple schools

Key Actions

  • Survey and develop multiple scopes of work

  • Prepare final application schedule and product submittal for project approval

  • Manage material purchasing and subcontracted labor for turnkey installation

  • Schedule site access and utility shutdowns with facility managers

  • On-Site Project Management by SMI Personnel

  • Conduct start-up and weekly safety meetings

  • Installation of 562 new steam traps

  • Installation of 300 steam and hot water control valves

  • Complete project commissioning, punch list and sign-off walk throughs

  • Provide O&M Manual with material and workmanship warranty