Case Study
Steam and Valve Retrofit Project Provides Long Beach Public Schools with Energy Savings and Reduced Emissions
SMI Impact
Savings in excess of 4,270 Mlb of fuel per year
CO2 emission reduction of 347,345 lbs of coal burned
Installation of 562 new steam traps and 300 steam and hot water control valves
Customer
A national ESCO contracted Steam Management, Inc. to design and complete installation of multiple ECMs at Long Beach Public Schools in Long Beach, New York.
Conditions
Legacy pneumatic control systems in all schools
Original equipment steam systems throughout all schools
Hurricane damaged basements and crawlspaces in multiple schools
Key Actions
Survey and develop multiple scopes of work
Prepare final application schedule and product submittal for project approval
Manage material purchasing and subcontracted labor for turnkey installation
Schedule site access and utility shutdowns with facility managers
On-Site Project Management by SMI Personnel
Conduct start-up and weekly safety meetings
Installation of 562 new steam traps
Installation of 300 steam and hot water control valves
Complete project commissioning, punch list and sign-off walk throughs
Provide O&M Manual with material and workmanship warranty